Complementary Services
Recycled asphalt works as a base material. It is basically cold asphalt and as such it is a cheaper alternative to hot mix. It is faster and easier and there is no down time. Farmers don’t have to stay off of it. There is no need to shut down their operations.
Tar and Chip, also known as Chipseal is a real hot fluffy Tar which is sprayed down. Tar and Chip works different then Blacktop. Tar and Chip is so thin that it works off the base and whatever the base will hold.
Get-It-Done does line striping. We line stripe parking lots and every once in a while we line stripe driveways. We do line striping, for handicapped spots we use stencils, and for commercial lots or big business buildings where people have their own parking spots, we number them 1 to 100 or 200.
You must be logged in to post a comment.